Lebanon

Climate commitments in Lebanon’s 2025 NDC

In its 2025 NDC, the Lebanese government pledges renewables for a quarter of electricity demand by 2035.

Overall level

No level yet

No visible progressStalledProgress seenAchieved

The needle appears once at least half the pledges are assessed; «too early to judge» does not count as assessed.

Assessed so far: LB-05 No visible progress.

During the review of separate implementation and pace findings, the country gauge uses the previous combined ratings for the pilot cards.

The pledges

5 pledges

No condition 2

Conditional on international support 2

The document does not say 1

Adaptation actions by sector

Agriculture · Crop suitability mapNational map unverified

National contribution · Action 9 · page 35

What would verify implementation?

A dated map or spatial dataset issued or adopted for Lebanon by an implementing institution. Check which crops and areas it covers and how it combines future climate scenarios, other hazards and future irrigation water availability.

What did we verify?

Regional research maps covering the Litani basin and predating the pledge model crop suitability through 2050. The national adaptation plan schedules development of a mapping tool for 2026–2028 (I.5.1.2). We found no Lebanese release after the NDC submission documenting how hazards and future irrigation water availability enter the suitability results.

Evidence checked · 19 November 2026

Action link

Water · Integrated Hydrological Information SystemTender documented · operation unverified

National contribution · Action 7 · page 43

What would verify implementation?

A dated operating record or data from the Ministry of Energy and Water platform showing connected stations, observation types and receipt times. Check real-time collection, integration and sharing of weather, streamflow, snowpack, rainfall and groundwater readings.

What did we verify?

UNICEF issued request for proposals LRPS-2026-9205779 on 21 August 2026. Bidding closed on 15 October. The adaptation plan schedules platform architecture for 2029–2032. We found no commissioning record or readings identifying stations already transmitting to the platform.

Evidence checked · 19 November 2026

Action link

Forestry · Restoration of war-damaged landInspections and distribution documented · restored area unverified

National contribution · Action 2 · page 38

What would verify implementation?

Identify a plot degraded by war and its area, with dated evidence after 30 September 2025 of planting, effective protection or assisted natural regeneration on that land. To count planting under LB-05, match the plot boundary and intervention date to before-and-after satellite imagery.

What did we verify?

A campaign launched in At Tiri on 19 December 2025 aimed to plant 10,000 olive trees. In a separate project, Green Southerners documented inspections of damaged groves, approval of 610 saplings for distribution, and distribution in Aita al-Shaab on 26 December in its English account. The project dates transport to 25 December 2025, while one sentence in the Arabic account gives 2024 for distribution the following day. The inspection and transport dates support 2025. The area of plots actually replanted and their planting dates remain unknown.

Evidence checked · 19 November 2026

Action link · Related pledge LB-05

About the country and its NDC

Procedural obligationsThe country submitted a 2035 NDC and its first transparency report on time.

Procedural obligations

The country submitted a 2035 NDC and its first transparency report on time.

The Paris Agreement gives developing countries flexibility in what their reports contain, not in when they are due. We check the deadline for the transparency report only, as we have not yet verified the exact deadline for 2035 NDCs. National communications are not counted because their wording is “should”.

Under the Paris Agreement

An NDC every five years binding (“shall”)
New-round contribution submitted on 30 September 2025. The five-year cycle is binding; submitting the 2035 contribution in 2025 is encouraged (“encourages”), not binding.
Text of the rule

Communicate a nationally determined contribution every five years (Paris Agreement, Article 4.9). Decision 6/CMA.3 encourages Parties to communicate in 2025 a contribution with an end date of 2035.

Article 4.9 · paragraph 2

A transparency report every two years, the first by end-2024 binding (“shall”)
First report submitted on 31 December 2024.
Text of the rule

Submit a biennial transparency report, the first at the latest by 31 December 2024 (Paris Agreement, Article 13, and decision 18/CMA.1).

Article 13.7 · paragraph 3

Under the Convention

A national communication every four years recommended (“should”)
Latest national communication in our records: 29 December 2022 (4 communications).
Text of the rule

Submit national communications on climate change (Convention, Article 12). Decision 1/CP.16 says non-Annex I Parties “should” submit them every four years, consistent with their capabilities and the support provided for reporting.

Article 12 · paragraph 60(b)

The wording of these rules is a draft not yet reviewed by a legal specialist; the links lead to the official texts.

Country profileWhat “conditional” means in this country’s document · Did the support the pledges depend on arrive? · What the first transparency report says

Climate commitments in Lebanon’s 2025 NDC

In its 2025 NDC, the Lebanese government pledges renewables for a quarter of electricity demand by 2035. The NDC defines its unconditional target as actions financed through international loans, and its conditional target as those needing additional grants.

What “conditional” means in this country’s document

The NDC defines its unconditional target as what Lebanon can implement nationally and through international support “in the form of loans or other repayable instruments”, and its conditional target as what needs additional international support “in the form of grants” (p. 22). “No condition” here includes borrowing abroad.

Did the support the pledges depend on arrive? Period: 2025–2035

Two pledges depend on “additional grants”. The support tables of the first transparency report record about USD 180 million in grants, 30.1 million of them for mitigation, for projects between 2010 and 2025, before the NDC period. Lebanon is asking the Green Climate Fund for USD 327.5 million; the Fund records two multi-country projects for it worth USD 4 million. As of November 2026 small grants have arrived since the NDC was submitted, among them USD 3 million from the Kuwait Fund for solar on public buildings and EUR 8 million from the EU for energy solutions for security institutions. The largest finance for renewables and the grid, the World Bank’s 2024 project, is a USD 250 million loan, of which OECD data record about 205 million under energy purposes. OECD data record a whole project value once it carries a climate marker, so they show where money was marked, not how much of it went to climate.

PledgeWhat the data showSupport
LB-02 Cut emissions 33% by 2035, with additional international grantsThe grants that arrived since 2025 are small, and no donor links them to this target.Too early to judge support
LB-04 Renewables meet 30% of electricity demand by 2035, with additional grantsThe NDC separates the two: loans count towards the 25% target, only grants towards this condition.Too early to judge support

What the first transparency report says

The report tracks the 2021 NDC (20% unconditional and 31% conditional cuts by 2030), and only the unconditional targets. These are dated figures we use as baselines; we do not judge the 2025 pledges by them.

Show the figures (12)
Latest inventory year
2022: 20,519.78 Gg CO2e excluding land use Page: 27
Emissions against business as usual
18,863 Gg in 2022, 33% below business as usual (28,362), driven by the crisis rather than policy Page: 45
Renewables
12% of power demand in 2022 (1,913 GWh), against 4% in 2021. The report gives no installed capacity in MW Page: 45
Conditional targets
“Lebanon is not reporting its progress compared to its conditional target” Page: 44
Heat in buildings
“no indicator has been identified” to track the renewable-heat target, and the conditional target is 16.5% in the tables and 18.5% in the summary Page: 46
Support received
About USD 227.5 million in 2020–2022, of which USD 30.4 million for mitigation Page: 85
War
Attributes the 2007 drop in emissions to damage from the July 2006 war, and does not mention the 2023–2024 war Page: 26
Tracking tables (CTF)
In Table 4.1 the row labels are shifted: the “BAU emissions” row holds the percentages (12, 29, 33), the “Difference” row holds the BAU values, and the “%” row holds the differences Page: Table4.1
Heat target in the tables
The building-heat target appears in Table 4.2 as 18 with a reference of 5, while the unconditional target is 11% and the report’s reference is 0%. The demand-reduction table (4.3) has no values Page: Table4.2
Indicator definition
The report and its tables define the indicator “without LULUCF and F-gases” and get 33% below BAU; the reviewers define it “including LULUCF and excluding F-gases” and get 45.0% Page: 12
Reviewers’ conclusion
“there are not yet enough data to sufficiently assess” progress; Lebanon “did not report updated assumptions and values underlying the baseline scenario”; renewable power needs 6 more percentage points to reach the 2030 target Page: 12
Government response to the review
The draft review was sent to the government on 28 May 2026, “which did not provide any comments” Page: 3
Options and measures we do not trackThe NDC does not list mitigation measures with figures; it refers to existing ministerial strategies, including the National Renewable Energy Action Plan (2025), the National Water Sector Strategy (2022), the National Cooling Plan (2024) and draft e-mobility and solid waste strategies (2025) (p. 23).

The NDC does not list mitigation measures with figures; it refers to existing ministerial strategies, including the National Renewable Energy Action Plan (2025), the National Water Sector Strategy (2022), the National Cooling Plan (2024) and draft e-mobility and solid waste strategies (2025) (p. 23). It sets eight adaptation priorities, in agriculture, forestry, water, biodiversity, urban infrastructure, public health, disaster risk reduction and tourism, each with “key actions” but no figures or dates (pp. 34–67). It says precise costing of the full NDC “remains under development” (p. 66). We track only what can be tested.

What the pledges say, and do not say, about warIt acknowledges the 2024 war and builds in post-conflict environmental recovery

It acknowledges the 2024 war and builds in post-conflict environmental recovery

The NDC says it was informed by the socioeconomic impact assessment of the 2024 war on Lebanon, calls for preventing climate harm from armed conflict and military activities, including the destruction of carbon sinks (PDF p. 7), and integrates post-conflict environmental recovery measures (p. 11). Among its adaptation actions is to “restore degraded lands affected by war” through reforestation, protection and natural regeneration (p. 38), but it estimates neither the area of those lands nor the war’s emissions.

LB-NDC3.txt#PDF 7 · LB-NDC3.txt#PDF 11 · LB-NDC3.txt#PDF 38
Documents submitted to the UNFCCC (10)Lebanon's Nationally Determined Contribution NDC 3.0 – Target Year 2035 · in force · 30 September 2025
How we assess pledgesWhat the Paris Agreement binds Parties to, and what it does not

What the Paris Agreement binds Parties to, and what it does not

Each Party shall prepare, communicate and maintain its contributions and “shall pursue domestic mitigation measures, with the aim of achieving the objectives” of them (Article 4.2). The Agreement binds Parties to pursue measures; reaching the number itself is not a legal obligation.

Status

Not yet assessed
Extracted from the pledge text; no evidence checked yet.
Too early to judge
We researched the pledge, but the NDC is recent and there are not yet enough data on the years after it to judge it. What we found is shown as a baseline or a first step.
Achieved
An independent source or measurement shows the full target reached by or before its deadline. An official announcement alone is not enough.
Progress seen
Output has been completed since counting began, at no less than half the required pace where a pace can be computed; the target is not yet met.
Stalled
Some output was completed, but below half the pace needed to reach the target on time, or the main projects have stopped.
No visible progress
A full year after counting began there is no completed output, or published data for the period show no change or a reversal.
Cannot be verified
The pledge’s wording cannot be measured at all, or there is no way to measure it: no open data, no projects that can be tracked and no satellite imagery. This is a finding about the pledge or the means of measuring it, not a breach.

Confidence

Confirmed
Two or more independent lines of evidence agree.
Likely
Strong evidence with one stated gap.
Possible
Consistent with the evidence, not proven.
Unresolved
Checked and not settled, or cannot be checked.
Contradicted
The evidence contradicts the claim.

Full methodology →