SyriaSY-01Renewable energy
Renewables at 10% of power production by 2030, if donors support it
Where does the pledge stand?
Implementation progress · Progress seen
SANA reported that the first phase of the Adra solar plant entered service on 29 September 2022 and supplied the grid, with 10 MW of installed capacity. Sentinel-2 imagery shows panels at the site. Confidence is possible because the finding rests on one project.
Pace towards the target · Cannot yet be assessed
The target is 10% of Syria’s electricity generation from renewables. The available baseline mainly covers the grid. Assessing the pace requires comparable national shares that include both on-grid and off-grid generation.
66% of the time between the NDC and the deadline has passed.
Last updated: 19 November 2026What do the status and confidence mean?
What did the country pledge?
The ratio of renewable energy is expected to reach 10% of power production by 2030 in case a real support by international donors is provided
Original document: Syrian Arab Republic Nationally Determined Contributions Under Paris Agreement on Climate
- Target
- 10% of power production
- Deadline
- 2030
- Baseline before the pledge
- The available IRENA series puts the recorded renewables share at 3.89% in 2018. Its coverage is mostly grid generation, and the NDC gives no comparable starting share that includes off-grid generation. There is therefore no national pace line. How we monitor this pledge
- Condition
- Conditional on international support
- What we measure
- Renewables’ share of electricity generation and on-grid and off-grid solar capacity in IRENA’s data.
How do we know?
- 1SANA: first phase of the Adra solar plant commissioned and connected to the gridOpen-source media · 29 September 2022
- 2Sentinel-2 imagery of the first phase of the Adra solar plantSatellite imagery · 10 November 2026
- 3OECD climate-related development finance, recipient perspective, 2018–2024Dataset · 2026
- 4IRENA: electricity capacity and generation in Syria by technology and grid connectionDataset · 28 September 2026
The full assessment
Progress is visible in implementation.
According to SANA, the first phase of the Adra solar plant entered service on 29 September 2022 with 10 MW of installed capacity, and the electricity it generated was fed into the grid.
Sentinel-2 imagery shows panels at the first-phase site.
Confidence is “possible” because the finding rests on one operating project.
Renewables’ share of Syria’s total on-grid and off-grid electricity generation remains unknown, so we cannot determine how close Syria is to its 10% target.
Project ledger
How much solar and renewable capacity actually operates on the grid, and how much does it add towards 10% of power production by 2030?
40 MWCompleted after the NDC was submitted according to saved sources: 40 MW in 2 projects.
- 130 MW Licensed PV projects built (18 September 2024) · الوطن: المنظومات الخاصة 1500 ميغاواط والمشاريع المرخصة 130 ميغاواط (18 أيلول/سبتمبر 2024)
- 1500 MW Private off-grid systems (estimate) (18 September 2024) · الوطن: المنظومات الخاصة 1500 ميغاواط والمشاريع المرخصة 130 ميغاواط (18 أيلول/سبتمبر 2024)
- 420 MW Solar projects “being carried out” in H1 2026, not itemised (9 August 2026) · سانا: وزير الطاقة يستعرض نتائج قطاع الكهرباء في النصف الأول من 2026
- 2500 MW Renewable energy plan target for solar by 2030 (18 September 2024) · الوطن: المنظومات الخاصة 1500 ميغاواط والمشاريع المرخصة 130 ميغاواط (18 أيلول/سبتمبر 2024)
How do we count?
The pledge is broad: it is met by many projects, not one decision, and no national figure measures the full share. So we record each project with its status and source, and count only what actually operates.
Only entries with status «operating» and a saved source count towards the total. Announcements, agreements, memoranda and projects under construction are listed separately and not added. Operating plants are checked on satellite imagery where possible.
Counted 2 projects
| Project | Capacity | Status | Status date | Satellite imagery | Sources |
|---|---|---|---|---|---|
Adra Industrial City plantThe official source is SANA's report of commissioning on 29 September 2022, the first phase of the «العهد» project, which targets 100 MW on more than 165 ha. The Attaqa article puts the 165 ha beside the 10 MW, but that is the whole project's area. The plant did not exist when the NDC was submitted in 2018. |
10 MW / 90 | operating | September 2022 | confirmed on imagery | 3 sources |
Hassia Industrial City plantSecondary source; official source needed. |
30 MW / 60 | operating | August 2024 | confirmed on imagery | منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025) |
Not counted yet 4 projectsannounced 1agreement or memorandum 3
| Project | Capacity | Status | Status date | Sources |
|---|---|---|---|---|
Wadi al-Rabi’ plant (BOO)May overlap with the other Wadi al-Rabi’ projects below. |
100 MW | announced | March 2025 | منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025) |
| Solar Rex projects (Rural Damascus and Hama) | 170 MW | agreement or memorandum | June 2025 | منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025) |
Solar Energy (US) dealThe source gives neither the signing date nor the site. |
200 MW | agreement or memorandum | — | منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025) |
Al-Harfi (Saudi) agreements at Wadi al-Rabi’Preceded by a 16 February 2026 memorandum for a 210 MW project with the same company; it is unclear whether that is part of the 760 MW. |
760 MW | agreement or memorandum | 5 August 2026 | سانا: اتفاقيات سورية سعودية لمحطات شمسية في ريف دمشق بقدرة 760 ميغاواط (5 آب/أغسطس 2026) |
What satellite imagery shows 2 projects
Adra Industrial City plant



Left: 9 October 2021; right: 10 November 2026. The yellow line is the site outline from a saved source.
Solar panels fill the mapped first-phase outline in Sentinel-2 imagery of 10 November 2026; the site was empty on 9 October 2021. The image series shows a much larger array inside the same «العهد» project outline, started between November 2022 and September 2023 and mostly complete by October 2024, so before the 210 MW memorandum of February 2026. SANA described the project in July 2025 as «قيد التنفيذ» (under implementation) at 100 MW; we found no source for the built capacity, so the array is not added to the total.
Hassia Industrial City plant

Left: 18 November 2023; right: 8 October 2026. The yellow line is the site outline from a saved source.
Several solar arrays were built east of Hassia Industrial City between the images of 18 November 2023 and 8 October 2026, covering more ground than 30 MW needs. The 30 MW plant cannot be told apart from the others, so we confirm solar at the industrial city without confirming its capacity.
Contains modified Copernicus Sentinel-2 data; site outlines from OpenStreetMap. Imagery confirms construction, not capacity or operation.
How we monitor this pledge
Next review · 31 March 2027
- Indicator
- Renewables’ share of Syria’s total on-grid and off-grid electricity production, to track the donor-dependent 10% target for 2030.
- Unit
- Per cent of generation, calculated from electricity produced in GWh.
- Share of
- Total grid and off-grid electricity generation in the same period.
- Baseline
- The available IRENA series puts the recorded renewables share at 3.89% in 2018. Its coverage is mostly grid generation, and the NDC gives no comparable starting share that includes off-grid generation. There is therefore no national pace line.
- What counts as a completed output
- A renewable facility verified to have entered service after counting began with documented operating capacity, or a published national share covering grid and off-grid generation. Track delivery of support separately.
Where we follow it
Project ledgerMain route
The pledge ledger documents commissioned projects and capacity from saved sources. Seek measured electricity production from operators for the sites they report.
Published data
IRENASTAT generation and capacity series and a national electricity balance when issued. Record grid and decentralized coverage and distinguish generation from capacity.
Satellite imagery
Sentinel-2 imagery for located utility-scale plants to confirm construction, paired with operating evidence independent of imagery.
Operating megawatts in the ledger indicate project delivery and stand in for generation share until comprehensive output data are available.
We measure something close to the indicator, not the indicator itself, so confidence is “Possible” at most.
Next review 31 March 2027
Sources we watch, and why13 sources
- سانا: الاقتصاد · official · automatic
The official agency publishes Ministry of Energy and Syrian Electricity Company statements on commissioning, agreements and output. - وزارة الطاقة السورية: قناة تلغرام @SyrMOfE · official · automatic
The ministry’s official channel posts agreements, plant commissioning and the minister’s statements as they happen. Its public page can be read automatically. - وزارة الطاقة السورية: الموقع الرسمي · official · manual
The ministry’s official site, for full statements and reports. It does not answer automated requests from outside Syria, so we open it by hand. - الإخبارية السورية: أخبار سوريا · official · automatic
The state channel covers project openings and officials’ field visits. - صحيفة الثورة · official · automatic
The state newspaper publishes ministries’ reports and detailed figures. - الوطن · local · automatic
Reports figures from the National Energy Research Center and the Investment Authority on licensed and built projects. - تلفزيون سوريا · local · automatic
Reports officials’ statements and decision texts across regions. Its RSS feed can be read automatically. - عنب بلدي · local · manual
Covers the north and areas official data miss, including local-council projects. The site refuses automated requests, so we open it by hand. - نورث برس · local · automatic
Covers north-east Syria, where homes and farms rely on off-grid solar. - الجمهورية · local · manual
In-depth investigations and analysis on the economy and energy that reveal what official statements leave out. The site refuses automated requests. - منصة الطاقة · secondary · automatic
A regional outlet that compiles projects and figures. A secondary source we use as a lead, seeking the official source for each figure. - الوكالة الدولية للطاقة المتجددة (IRENASTAT) · data · automatic
Yearly capacity and generation on and off grid, to compare with the total we build. - صور Sentinel-2 (كوبرنيكوس) · verification · manual
To check that an announced plant exists and how much area it covers.
What’s new?
Government announcements we follow. What official bodies announce, as published. Not counted in the total until we check it.
Announcement: UnresolvedNew solar projects of 420 MW carried out in the first half of 2026.
- Our side
- not yet checkedThe statement names no plants and does not say whether they run.
Announcement: UnresolvedThree agreements signed with Saudi firm Al-Harfi for solar plants in Wadi al-Rabi’, Rif Dimashq, totalling 760 MW, to be built in four to five years.
- Our side
- not yet checked