Pilot version: the observatory team has reviewed these assessments; they have not yet been sent to the government bodies concerned for reply. Corrections are welcome at observatory@paxmemoria.org.
PaxMemoriaPledgeMeter Methodology

SyriaSY-01Renewable energy

Renewables at 10% of power production by 2030, if donors support it

Where does the pledge stand?

Implementation progress · Progress seen

SANA reported that the first phase of the Adra solar plant entered service on 29 September 2022 and supplied the grid, with 10 MW of installed capacity. Sentinel-2 imagery shows panels at the site. Confidence is possible because the finding rests on one project.

Pace towards the target · Cannot yet be assessed

The target is 10% of Syria’s electricity generation from renewables. The available baseline mainly covers the grid. Assessing the pace requires comparable national shares that include both on-grid and off-grid generation.

66% of the time between the NDC and the deadline has passed.

Last updated: 19 November 2026What do the status and confidence mean?

What did the country pledge?

The ratio of renewable energy is expected to reach 10% of power production by 2030 in case a real support by international donors is provided
From the English translation · Page: PDF 7
Target
10% of power production
Deadline
2030
Baseline before the pledge
The available IRENA series puts the recorded renewables share at 3.89% in 2018. Its coverage is mostly grid generation, and the NDC gives no comparable starting share that includes off-grid generation. There is therefore no national pace line. How we monitor this pledge
Condition
Conditional on international support
What we measure
Renewables’ share of electricity generation and on-grid and off-grid solar capacity in IRENA’s data.
Support the pledge depends on:The required support did not arriveRenewable energy received only about USD 0.2 million in seven years.Support details are in the country profile.

How do we know?

  1. 1SANA: first phase of the Adra solar plant commissioned and connected to the gridOpen-source media · 29 September 2022
  2. 2Sentinel-2 imagery of the first phase of the Adra solar plantSatellite imagery · 10 November 2026
  3. 3OECD climate-related development finance, recipient perspective, 2018–2024Dataset · 2026
  4. 4IRENA: electricity capacity and generation in Syria by technology and grid connectionDataset · 28 September 2026
The full assessment

Progress is visible in implementation.

According to SANA, the first phase of the Adra solar plant entered service on 29 September 2022 with 10 MW of installed capacity, and the electricity it generated was fed into the grid.

Sentinel-2 imagery shows panels at the first-phase site.

Confidence is “possible” because the finding rests on one operating project.

Renewables’ share of Syria’s total on-grid and off-grid electricity generation remains unknown, so we cannot determine how close Syria is to its 10% target.

Project ledger

How much solar and renewable capacity actually operates on the grid, and how much does it add towards 10% of power production by 2030?

40 MWCompleted after the NDC was submitted according to saved sources: 40 MW in 2 projects.

How do we count?

The pledge is broad: it is met by many projects, not one decision, and no national figure measures the full share. So we record each project with its status and source, and count only what actually operates.

Only entries with status «operating» and a saved source count towards the total. Announcements, agreements, memoranda and projects under construction are listed separately and not added. Operating plants are checked on satellite imagery where possible.

Counted 2 projects
ProjectCapacityStatusStatus dateSatellite imagerySources
Adra Industrial City plant

The official source is SANA's report of commissioning on 29 September 2022, the first phase of the «العهد» project, which targets 100 MW on more than 165 ha. The Attaqa article puts the 165 ha beside the 10 MW, but that is the whole project's area. The plant did not exist when the NDC was submitted in 2018.

10 MW / 90 operating September 2022 confirmed on imagery
3 sources
Hassia Industrial City plant

Secondary source; official source needed.

30 MW / 60 operating August 2024 confirmed on imagery منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025)
Not counted yet 4 projectsannounced 1agreement or memorandum 3
ProjectCapacityStatusStatus dateSources
Wadi al-Rabi’ plant (BOO)

May overlap with the other Wadi al-Rabi’ projects below.

100 MW announced March 2025 منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025)
Solar Rex projects (Rural Damascus and Hama) 170 MW agreement or memorandum June 2025 منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025)
Solar Energy (US) deal

The source gives neither the signing date nor the site.

200 MW agreement or memorandum — منصة الطاقة: أهم 5 مشروعات طاقة شمسية في سوريا (آب/أغسطس 2025)
Al-Harfi (Saudi) agreements at Wadi al-Rabi’

Preceded by a 16 February 2026 memorandum for a 210 MW project with the same company; it is unclear whether that is part of the 760 MW.

760 MW agreement or memorandum 5 August 2026 سانا: اتفاقيات سورية سعودية لمحطات شمسية في ريف دمشق بقدرة 760 ميغاواط (5 آب/أغسطس 2026)
What satellite imagery shows 2 projects

Adra Industrial City plant

Adra Industrial City plant: Before and after construction, Sentinel-2 imagery
Before and after construction
Adra Industrial City plant: Wider view of the site, Sentinel-2 imagery
Wider view of the site
Adra Industrial City plant: Series of images, left to right in time order, Sentinel-2 imagery
Series of images, left to right in time order

Left: 9 October 2021; right: 10 November 2026. The yellow line is the site outline from a saved source.

Solar panels fill the mapped first-phase outline in Sentinel-2 imagery of 10 November 2026; the site was empty on 9 October 2021. The image series shows a much larger array inside the same «العهد» project outline, started between November 2022 and September 2023 and mostly complete by October 2024, so before the 210 MW memorandum of February 2026. SANA described the project in July 2025 as «قيد التنفيذ» (under implementation) at 100 MW; we found no source for the built capacity, so the array is not added to the total.

Hassia Industrial City plant

Hassia Industrial City plant: Before and after construction, Sentinel-2 imagery
Before and after construction

Left: 18 November 2023; right: 8 October 2026. The yellow line is the site outline from a saved source.

Several solar arrays were built east of Hassia Industrial City between the images of 18 November 2023 and 8 October 2026, covering more ground than 30 MW needs. The 30 MW plant cannot be told apart from the others, so we confirm solar at the industrial city without confirming its capacity.

Contains modified Copernicus Sentinel-2 data; site outlines from OpenStreetMap. Imagery confirms construction, not capacity or operation.

How we monitor this pledge

Next review · 31 March 2027
Indicator
Renewables’ share of Syria’s total on-grid and off-grid electricity production, to track the donor-dependent 10% target for 2030.
Unit
Per cent of generation, calculated from electricity produced in GWh.
Share of
Total grid and off-grid electricity generation in the same period.
Baseline
The available IRENA series puts the recorded renewables share at 3.89% in 2018. Its coverage is mostly grid generation, and the NDC gives no comparable starting share that includes off-grid generation. There is therefore no national pace line.
What counts as a completed output
A renewable facility verified to have entered service after counting began with documented operating capacity, or a published national share covering grid and off-grid generation. Track delivery of support separately.

Where we follow it

  • Project ledgerMain route

    The pledge ledger documents commissioned projects and capacity from saved sources. Seek measured electricity production from operators for the sites they report.

  • Published data

    IRENASTAT generation and capacity series and a national electricity balance when issued. Record grid and decentralized coverage and distinguish generation from capacity.

  • Satellite imagery

    Sentinel-2 imagery for located utility-scale plants to confirm construction, paired with operating evidence independent of imagery.

Proxy

Operating megawatts in the ledger indicate project delivery and stand in for generation share until comprehensive output data are available.

We measure something close to the indicator, not the indicator itself, so confidence is “Possible” at most.

Next review 31 March 2027

Sources we watch, and why13 sources

What’s new?

Government announcements we follow. What official bodies announce, as published. Not counted in the total until we check it.

Announcement: UnresolvedMinister of Energy, on X as reported by SANA · 9 August 2026 · We return to it: December 2026New solar projects of 420 MW carried out in the first half of 2026.
Our side
not yet checkedThe statement names no plants and does not say whether they run.
Announcement: UnresolvedSyrian Electricity Company · 5 August 2026 · We return to it: August 2027Three agreements signed with Saudi firm Al-Harfi for solar plants in Wadi al-Rabi’, Rif Dimashq, totalling 760 MW, to be built in four to five years.