YemenYE-16Other
Climate-proof 50% of priority coastal and urban infrastructure assets by 2035
Where does the pledge stand?
Progress towards this target cannot be measured yet: the NDC gives its baseline only as “Limited coverage”, with no figure (PDF p. 52), and does not list the priority coastal and urban infrastructure assets the percentage is counted from.
0% of the time between the NDC and the deadline has passed.
Last updated: 18 November 2026What do the status and confidence mean?
What did the country pledge?
Together, these measures aim to climate-proof 50% of priority coastal and urban infrastructure assets by 2035, strengthen resilience in 10 major cities and vulnerable neighbourhoods, improve flood management and drainage systems across 12 cities, protect six coastal cities and strategic coastal assets, and reduce urban heat risks through resilient and green infrastructure.
In the target column of the same table: «50% of priority assets»
Original document: Yemen NDC 3.0
- Target
- 50% of priority assets
- Deadline
- 2035
- Baseline before the pledge
- The NDC describes coverage as limited, with no figure or asset list. Check whether the Action and Investment Plan will define the list and method. A pace line needs a measurable starting point. How we monitor this pledge
- Condition
- The document does not say whether it is conditional
- What we measure
- Share of priority coastal and urban infrastructure assets climate-proofed.
- Note from the document
- The NDC says that where Table 4.1 gives a baseline as “to be established” or “under assessment”, the baseline and the corresponding set of priority infrastructure assets will be defined and quantified in the forthcoming NDC Action and Investment Plan (PDF pp. 50–51). The sentence names infrastructure assets, and this is the only infrastructure-asset target, yet its baseline is given as “Limited coverage”. The NDC’s own wording therefore looks inconsistent, and we read the sentence as covering this target; this is our inference.
How do we know?
- 1Yemen NDC 3.0: baseline “Limited coverage” with no figure; the baseline and the set of priority assets will be defined and quantified in the forthcoming NDC Action and Investment Plan (PDF pp. 50–52)Document · 9 November 2026
The full assessment
Progress towards this target cannot be measured yet: the NDC gives its baseline only as “Limited coverage”, with no figure (PDF p. 52), and does not list the priority coastal and urban infrastructure assets the percentage is counted from.
The NDC says that where a baseline is “to be established” or “under assessment”, the baseline and the corresponding set of priority assets will be defined and quantified in the forthcoming NDC Action and Investment Plan, and it names infrastructure assets (PDF pp. 50–51).
This target’s baseline is “Limited coverage”, but we read the sentence as covering it; this is our reading.
We therefore rate it unverifiable; this is a finding about what has been published, not about implementation.
We return to it at the end of 2027, when the first transparency report the NDC plans is expected (PDF p. 84), or when the plan is published, and reconsider the rating if a baseline figure appears.
How we monitor this pledge
Next review · 31 December 2027
- Indicator
- Share of priority coastal and urban infrastructure assets climate-proofed to a verifiable standard.
- Unit
- Per cent.
- Share of
- All coastal and urban assets on the official priority list if published.
- Baseline
- The NDC describes coverage as limited, with no figure or asset list. Check whether the Action and Investment Plan will define the list and method. A pace line needs a measurable starting point.
- What counts as a completed output
- An identified asset with climate-proofing works brought into service after counting began, backed by a verified adaptation standard or performance test. Log relevant work before the list is published and count an asset in the share once its eligibility is verified.
Where we follow it
Published dataMain route
The Action and Investment Plan and transparency reports, then public works, municipal, port and infrastructure authority records identifying assets and operating status.
Dedicated investigation
Published handover and engineering inspection records for coastal protection, drainage and related projects. Match completed works to the asset and the hazard addressed.
Next review 31 December 2027