Climate resilience measures in 50% of priority health facilities by 2035
Where does the pledge stand?
Progress towards this target cannot be measured yet: the NDC sets neither its baseline nor the list of priority health facilities the percentage is counted from, and says both will be defined in the forthcoming NDC Action and Investment Plan (PDF pp. 50–52).
0% of the time between the NDC and the deadline has passed.
Last updated: 18 November 2026What do the status and confidence mean?
What did the country pledge?
The package will support climate-informed disease surveillance, heat-health action, resilient health facilities, emergency response capacity, and safer WASH conditions in vulnerable communities, helping to reduce climate-related health risks and protect the most exposed populations and ensure that 50% of priority health facilities implement climate resilience measures linked to climate-informed disease surveillance and early warning by 2035.
In the target column of the same table: «50% of priority health facilities»
Original document: Yemen NDC 3.0
- Target
- 50% of priority health facilities
- Deadline
- 2035
- Baseline before the pledge
- The NDC says the baseline is to be established and leaves priority-facility identification to the Action and Investment Plan. A pace line needs a facility list and a starting assessment. How we monitor this pledge
- Condition
- The document does not say whether it is conditional
- What we measure
- Share of priority health facilities applying climate resilience measures linked to climate-informed disease surveillance and early warning.
- Note from the document
- The NDC says the baseline and the priority set for this target will be defined and quantified in the forthcoming NDC Action and Investment Plan, so that progress against the percentage can be measured (PDF pp. 50–51). Table 4.6 gives “200 facilities; 20 regional hubs” (PDF p. 58); this is a measure quantity, not the priority set.
How do we know?
- 1Yemen NDC 3.0: baseline “to be established”; the priority set will be defined and quantified in the forthcoming NDC Action and Investment Plan (PDF pp. 50–52)Document · 9 November 2026
The full assessment
Progress towards this target cannot be measured yet: the NDC sets neither its baseline nor the list of priority health facilities the percentage is counted from, and says both will be defined in the forthcoming NDC Action and Investment Plan (PDF pp. 50–52).
We therefore rate it unverifiable; this is a finding about what has been published, not about implementation.
We return to it at the end of 2027, when the first transparency report the NDC plans is expected (PDF p. 84), or when the plan is published, and reconsider the rating if the baseline appears.
How we monitor this pledge
Next review · 31 December 2027
- Indicator
- Share of priority health facilities implementing resilience measures demonstrably linked to climate-informed disease surveillance and early warning.
- Unit
- Per cent.
- Share of
- All health facilities on the official priority list once published.
- Baseline
- The NDC says the baseline is to be established and leaves priority-facility identification to the Action and Investment Plan. A pace line needs a facility list and a starting assessment.
- What counts as a completed output
- An identified facility with a qualifying measure verified in operation after counting began and linked to climate-informed surveillance and early warning. Count it in the share once its list inclusion is verified; a building upgrade alone does not establish the link.
Where we follow it
Published dataMain route
The Action and Investment Plan, health ministry reports and transparency reports for the priority list and facility status. Seek facility-level evidence of linkage to surveillance and warning systems.
Dedicated investigation
Published health-project completion reports, with operating checks against surveillance records or published warning tests where available, using facility-level aggregates.
Next review 31 December 2027